Lenovo 6528 User Manual

Page 111

Advertising
background image

1

Battery

2

Battery carrier

3

RAID adapter

4

Connector for battery carrier

b. Press the battery carrier into the connector on the ServeRAID adapter until

it is firmly connected.

c. Secure the battery carrier to the ServeRAID adapter with the screws that

came with the battery pack.

4. Turn the ServeRAID-MR10is adapter so that the ServeRAID-MR10is adapter

keys align correctly with the connector.

Attention:

Incomplete insertion might cause damage to the system board or

the ServeRAID-MR10is adapter.

1

ServeRAID-MR10is

Chapter 6. Installing and replacing customer replaceable units

95

Advertising
This manual is related to the following products: