Lopi Leyden 028-S-75-2 User Manual

Page 16

Advertising
background image

16

Stove Installation

(for qualified installers only)

© Travis Industries

100-01177

4060802

Standard Ceiling
with a Factory
Built Chimney

Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)

Chimney Sections

Minimum Air Space to
Combustibles (See
Chimney Manufacturer's
Instructions - usually 2")

Chimney Connector Sections

Follow the chimney
manufacturer's instructions
and clearances for roof
penetrations. A storm collar
and flashing are required
(some require a radiation
shield).

}

}

Minimum 15'
Maximum 33'

Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)

Floor Protection
(See the section "Floor
Protection Requirements"
for more details)

Follow the chimney
manufacturer's instructions
and clearances for floor
penetrations. A ceiling
support is required, an attic
insulation shield is required
where insulation is present.

Insulation

Figure 13

Cathedral Ceiling
with a Factory
Built Chimney

Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)

Chimney Sections

Minimum Air Space to
Combustibles (See Chimney
Manufacturer's Instructions -
usually 2")

Follow the chimney
manufacturer's instructions
and clearances for roof
penetrations. A storm
collar, flashing, and
cathedral-style chimney
support are required
(some require a radiation
shield).

}

Minimum 15'
Maximum 33'

Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)

Floor Protection
(See the section "Floor
Protection Requirements"
for more details)

Chimney
Connector
Sections

Figure 14

Advertising