Hardware installation, 1 front panel, Ront – Planet Technology WGS3-2840 User Manual

Page 9: Anel

Advertising
background image

- 9 -

2. HARDWARE INSTALLATION

This product provides three different running speeds – 10Mbps, 100Mbps and 1000Mbps in the same Layer 3 Managed
Switch and automatically distinguishes the speed of incoming connection.

This section describes the hardware features of Layer 3 Managed Switch. For easier management and control of the Layer
3 Managed Switch, familiarize yourself with its display indicators, and ports. Front panel illustrations in this chapter display
the unit LED indicators. Before connecting any network device to the Layer 3 Managed Switch, read this chapter carefully.

2.1 Front Panel

The Front Panel of the Layer 3 Managed Switch consists of 24x Auto-Sensing 10/100Mbps Ethernet RJ-45 Ports and

provides 4-Port Gigabit TP/SFP combo interfaces either can be 1000Base-T for 10/100/1000Mbps or 1000Base-SX/LX
through SFP (Small Factor Pluggable) interface.

The LED Indicators are also located on the front panel of the Layer 3 Managed Switch.

Figure 2-1: Layer 3 Managed Switch front panel

2.1.1 LED indicators

System

LED

Color

Function

PWR

Green

Lights to indicate that the Switch has power.

SYS

Green

Lights to indicate that Switch is operating.

Per 10/100Mbps port

LED

Color

Function

LNK

Green

Lights to indicate the link through that port is successfully established.

ACT

Orange Blink to indicate that the switch port is actively sending or receiving data.

Per 10/100/1000Base-T port /SFP combo interfaces

LED

Color

Function

LNK

Green

Lights to indicate the link through that port is successfully established.

ACT

Orange Lights to indicate that the switch port is actively sending or receiving data.

Advertising