Assemble the base – PB Heat 211A User Manual

Page 11

Advertising
background image

9

ASSEMBLE THE BASE

A. BASE ASSEMBLY

1. Collect the crates containing the Base Assembly parts.

Table 2.1 (on page 11) shows the quantity of each
crate required. The crates contain the following parts:

2. Open crate number 2. Remove the End Panels and

mount a Support Channel Clip toward the rear on
each panel as shown in Figure 2.2 using 1/4"-20 x
1/2" (13 mm) long round head machine screws and
1/4" lock washers provided.

2. ASSEMBLE THE BASE

2

2AA

2BB

2CC

2DD

2EE

Crate

Right End Panel Sub-Assembly

Left End Panel Sub-Assembly

Burner Support Channel Clips (2)

Front Panel Sub-Assembly

Back Panel Sub-Assembly

Burner Support Channel

Front Panel Support Bracket

Section Assembly Kit

Front Panel Sub-Assembly

Back Panel Sub-Assembly

Burner Support Channel

Angle Tie Brace

Front Panel Support Bracket

Section Assembly Kit

Front Panel Sub-Assembly

Back Panel Sub-Assembly

Burner Support Channel

Angle Tie Brace

Front Panel Support Bracket

Section Assembly Kit

Front Panel Sub-Assembly

Back Panel Sub-Assembly

Burner Support Channel

Angle Tie Brace

Front Panel Support Bracket

Section Assembly Kit

Front Panel Sub-Assembly

Back Panel Sub-Assembly

Burner Support Channel

Angle Tie Brace

Front Panel Support Bracket

Section Assembly Kit

Items

90338

90340

90341

90342

90343

90344

Sub-Assembly #

GG-2105
GG-2106
GG-2070
GG-2080
GG-2081
GG-2066
GG-2069
GG-1030

GG-2080-1
GG-2081-1
GG-2066-1

GG-2065
GG-2069
GG-1030

GG-2080-2
GG-2081-2
GG-2066-2

GG-2065
GG-2069

GG-1030-1
GG-2080-3
GG-2081-3
GG-2066-3

GG-2065
GG-2069

GG-1030-2
GG-2080-4
GG-2081-4
GG-2066-4

GG-2065
GG-2069

GG-1030-3

Part #

Figure 2.2: Steel Base Assembly

Figure 2.1: Boiler Base Assembly

Advertising