Assemble the base – PB Heat 211A User Manual

Page 14

Advertising
background image

12

ASSEMBLE THE BASE

4. Place only the Burners with pilots mounted in the

locations given in Table 2.2. Install the Burners by
slipping the opening on the front of the burner over
the orifice adapter and slipping the pin on the end of
the burner into the hole in the Burner Support
Channel directly opposite the orifice.

5. Cut and fit the 1/4" aluminum tubing provided from

the pilot gas shut-off device(s) to the pilot burners.

6. Do not install the remaining burners until the Boiler

Sections are installed.

1/4" X 1-1/2"

(38 mm) long Nipple

(2) 1/4" Street Elbow

Imperial #69F Elbow

1/8" NPT x 1/4" O.D. Tubing

PB-H91BG-2 or

H-V8046C

Pilot Gas Valve

1/4" x 1/8"

Hex Bushing

3/8" Thermopilot

Valve(s) H17CA

(2) 5/16"-18 x 3/4" (19mm) long

Square Head Set Screw

3/8" x 1/4" Elbow

Imperial #68F

1/4" NPT x 3/8" O.D.

Tube Straight Connector

Ignition Control & Relay

Mounting Box Assembly

(Standard HSP System, X-3011-3)

(Other panels mounted on

jacket front, left side)

3/8" Pipe Cap

Pipe Cap

Test Plug

Mounting Clamp

GG-3052 thru GG-3052-3

Orifice Spud

X-4026

Manifold Weldment

GG-4084 thru GG-4084-46

3/8" x 3/8" x 1/4" Tee

Figure 2.5: Typical Gas Manifold and Pilot Line Assembly

Advertising