Place the boiler – PB Heat Gas/Oil Boilers User Manual

Page 12

Advertising
background image

A. PACKAGED BOILER

1. Remove crate top and sides. Remove any loose

cartons. Remove burner support pedestal and
nipple, if supplied

2. Lift boiler off crate pallet. Move to location

determined in Chapter 1: Preinstallation.

3. Remove lifting frame and hardware.

4. Re-install burner support pedestal and nipple if

necessary.

5. Proceed to Chapter 3: Piping the Boiler.

B. ASSEMBLED BLOCK BOILER

1. Move block to location determined in Chapter 1:

Preinstallation.

2. Remove lifting frame and hardware.

3. Proceed to Section D: Install Coils or Plates

C. KNOCKDOWN BOILER

1. Place channel rails as shown in Figure 1.4.

2. Open the Section Assembly Kit cartons. These

cartons contain the parts needed for assembly of the
sections.

3. Place the Back Section on the floor as shown in

Figure 2.1.

4. The Back Section combustion chamber area is lined

with a ceramic fiber blanket liner. Make sure the liner
is in good condition. Minor tears are not a problem,
but there should be no holes in the insulation.

10

PLACE THE BOILER

2. PLACE THE BOILER

Figure 2.1: Lay Sections on Floor and Apply Rope Seal and Gaskets

Advertising