PB Heat Gas/Oil Boilers User Manual

Page 21

Advertising
background image

H. INSTALL FLUE BAFFLES

1. Remove the Front Cleanout Plate from Front

Section.

2. Open Baffles carton. Remove Baffles. For LC Only –

Save Ceramic Fiber Liner for Section I. Save Rating
Label for Chapter 4. Models LCE-13 through LCE-
20 do not require baffles.

3. Place baffles as shown in Figure 2.14. Three of these

are special stainless steel baffles, identified with a
1/4" hole punched in each end. These baffles must
be placed in the lowest row of tubes.

4. Install the Front Cleanout Plate.

I.

INSTALL CHAMBER LINER

1. (LCE) Remove Ceramic Fiber Liner from Jacket

Carton E. Place the liner on the floor of the
combustion chamber. Place the front end of the liner
flush with the inside of the Front Section. The liner is
24 inches wide. It will not extend all the way to the
rear of the boiler on all boiler sizes. No adhesive is
required, just press the liner down firmly.

19

PLACE THE BOILER

Figure 2.14: Flue Baffle Locations

Advertising