Assemble the jacket – PB Heat Gas/Oil Boilers User Manual

Page 29

Advertising
background image

A. PREPARE THE PARTS

1. Collect all the jacket cartons: Jacket Front & Back

Carton plus Jacket Side & Top Cartons. See
the Shipping List in the front of this manual for the
jacket cartons required. The cartons contain the
jacket parts and screws. The jacket panels are pre-
insulated.

2. Remove all needed knockouts from the jacket parts

before beginning assembly.

B. APPLY JACKET SIDES AND CORNERS

1. See Figure 4.2 for details.

2. The Side Panels can be used on either side of

the boiler.

3. Place the Jacket Side Panels on each side leaned

against the Boiler Sections.

4. On Models LC-08 through LC-12, each side uses

two panels. Place the panels so the seam is centered
on the Tapped Intermediate Section. On LCE
models, place panels in the sequence shown in
Table 4.1.

5. On boilers with two or more Jacket Side Panels per

side, join the panels together with #10 x 1/2" sheet
metal screws. Also attach the Jacket Side Panel
Reinforcing Angle inside the jacket at the bottom of
the seam.

6. Attach the Left Front Corner Panel to the Left Side

Panel with #10 x 1/2" sheet metal screws.

7. Attach the Right Front Corner Panel to the Right

Side Panel with #10 x 1/2" sheet metal screws.

C. APPLY JACKET FRONT PANELS

1. Attach the Upper Front Panel to the Right and Left

Front Corner Panels with #10 x 1/2" sheet metal
screws.

2. Attach the Middle Front Panel and Lower Front Rail

in the same manner.

3. Position the Jacket Assembly with the front panels

pushed up against the front section. You will need
the jacket in this position to install the Burner Front
Plate.

D. APPLY JACKET REAR PANEL

1. Attach the Rear Jacket Panel to the Jacket Side

Panels with #10 x 1/2" sheet metal screws.

E. APPLY JACKET TOP PANELS

1. Attach the Top Front Panel to the Sides and Upper

Front Panel with #10 x 1/2" sheet metal screws.

2. Models LC-08 through LC-12 use two Jacket Top

Panels. Place them on top with the seam at the same
point as the side panels. Join them at their seam
with #10 x 1/2" sheet metal screws. On LCE models,
place panels in the sequence shown in Table 4.1.

3. Attach the Jacket Top Panel to the Jacket Top Front

Panel with #10 x 1/2" sheet metal screws.

4. Attach the Top Rear Panel to the Jacket Top Panel

with #10 x 1/2" sheet metal screws.

5. Finish by placing #10 x 1/2" sheet metal screws in

the remaining holes along the Jacket Top Panel
flanges, into the Jacket Side Panels.

F.

APPLY PLATES AND LABELS

1. Mount Boiler Rating Plates and Agency Plates on the

Upper Jacket Front Panel as shown in Figure 4.1.

2. Secure metal plates with #6 x 1/4" sheet metal

screws. Apply all adhesive-backed labels.

27

4. ASSEMBLE THE JACKET

Figure 4.1: Location of Rating, Agency and

Instruction Plates on Jacket Front
Top Panel

Table 4.1: Jacket Top & Side Panel Placement

LCE-13
LCE-14
LCE-15
LCE-16
LCE-17
LCE-18
LCE-19
LCE-20
LCE-21
LCE-22
LCE-23
LCE-24

Model

Locate Jacket Top and Side Panels in

the Position Below

(Numbers are from Rear to Front)

5

(Front)

4

3

2

1

(Rear)







E
E
E
E
E




E
E
E
A
A
B
B

C

E
E
E
E
A
B

C
A
B
B
B
B

B
B
B
C
B
B
B
B
B
B
B
B

A
B
C
C
B
B
B
B
B
B
C
C

ASSEMBLE THE JACKET

Advertising