Warning – PB Heat Gas Boiler User Manual

Page 25

Advertising
background image

23

VENTING, INLET AIR AND CONDENSATE

Figure 5.7: PI-80, PI-140, PI-199 Sidewall Venting

with 3" Pipe (3" Vent Kit).

Figure 5.9: PI-80, PI-140, PI-199 Sidewall Venting

with 3" Pipe (Concentric Vent Kit).

Figure 5.10: PI-T50 & PI-T80 Sidewall Venting with

2" Pipe (Concentric Vent Kit).

All exhaust vent pipes must be glued, properly
supported, and pitched at a minimum of ¼" per foot
back to the boiler. Failure to do so may result in
severe personal injury, death, or substantial property
damage.

WARNING

Figure 5.8: PI-T50 & PI-T80 Sidewall Venting with

2" Pipe (2" Vent Kit).

Advertising