Deice control – Panasonic CS-E21CKE User Manual

Page 40

Advertising
background image

8.2.3.6. Deice Control

A. Deice operation (Normal Deice Operation)

1. Detection methods

Outdoor heat exchanger temperature sensor, timer.

2. Deice operation time chart

Notes

a. During deice operation, the relationship between outdoor pipe temperature and time T1 is such operation will

proceed to next stage.

b. The deice will be performed only after 1 hour from when the operation has started.

c.

When Comp. OFF by the sequence No. 1, 6, 7 compressor can restart back without 3 minutes waits (immediate
restart).

Outdoor heat exchanger temperature

a

15°C

b

18°C

c

25°C

40

Advertising
This manual is related to the following products: