Unpacking and positioning the mgc+100, Unpacking and positioning the mgc+100 -4 – Polycom DOC2231A User Manual

Page 16

Advertising
background image

Chapter 2 - Hardware Installation

2-4

Unpacking and Positioning the MGC+100

To unpack and position the MGC+100:

1.

When you receive your MGC+100, inspect the equipment for damage
and verify that the components match the packing slip. If you did not
receive a component or if there is damage to the system, notify your
service representative immediately.

Figure 2-1: MGC+100 package

2.

Place the MGC+100 unit on a stable flat surface in a location that meets
the MGC+ environment requirements, which are:

Operating temperature: 10°–40°C (50°–104°F) or 10°–35°C
(50°–95°F) when installed in a 19” rack

Humidity: 15%–90% non-condensing

Altitude: Up to 3,000m (10,000ft)

ESD: +8 kV

Carrying Strap

Lock in Open Position

Wood Packing Case

Lock in Closed Position

Advertising