Mgc+50 hardware installation, Unpacking and positioning the mgc+50, Mgc+50 hardware installation -7 – Polycom DOC2231A User Manual

Page 19: Unpacking and positioning the mgc+50 -7

Advertising
background image

MGC+50/MGC+100 Getting Started Guide

2-7

MGC+50 Hardware Installation

Unpacking and Positioning the MGC+50

To unpack and position the MGC+50:

1.

When you receive your MGC+50, inspect the equipment for damage and
verify that the components match the packing slip. If you did not receive
a component or if there is damage to the system, notify Polycom
immediately.

Figure 2-3: MGC+50 package

2.

Place the MGC+50 unit on a stable flat surface in a location that meets
the MGC+50’s environment requirements, which are:

Operating temperature: 10°–40°C (50°–104°F)

Humidity: 15%–90% noncondensing

Altitude: Up to 3,000m (10,000ft)

ESD: +8 kV

Carrying Strap

Lock in Open Position

Wood Packing Case

Lock in Closed Position

Advertising