Adding postage, 6 • adding postage/connecting to data center – Pitney Bowes SV62214 User Manual

Page 68

Advertising
background image

6-9

6 • Adding Postage/Connecting to Data Center

SV62214 Rev. A

Adding Postage

You can add postage to your machine any time you need to, as long
as you have enough funds in your Postage By Phone® ac count and
your system is connected to the Pitney Bowes Data Center.

ADD POSTAGE TO METER
◄Add $xx
◄Add another amount
◄Check PBP balance

i

NOTE 1:

The minimum amount of postage you can add is $1.

i

NOTE 2:

The amount shown in the "Add $xx" selection line

represents the amount of postage you added the last time.

3. The system connects to the Pitney Bowes Data Center (this may

take a few moments). Various screens display, letting you know
the status of the process.

4. The Amount Added and Available balances displays.

POSTAGE ADDED

Amount Added $xx
Available $xx
Receipt? (Yes or No)

1. Press

Add Postage

.

2. You may select “Add $xx” to add the amount shown.
OR

Select “Add another amount”. Key in the amount, in whole dol-
lars, that you want to add and select “Continue”.

Amount Added

– the amount of the postage downloaded into the

meter

Available

– the amount of postage available to use in the meter.

This represents any balance you had in the meter before adding
postage, plus the refill amount.

Advertising