Installation, Warning – Rheem Commercial Power Direct Vent Water heater User Manual

Page 10

Advertising
background image

10

installation

gP100-250

§

§

§

§

§

§

Inlet

Outlet

Sheet Metal Shield on Brick or

Masonry Walls

Outside of

Building Wall

§

Mortar or

Silicone Caulk

From Water

Heater

4” Vent

Pipe

4” Pipe

Coupling

Vent Terminal with

1

/

2

"

Mesh Protective

Screen Inside

4” Pipe

Coupling

4” Vent

Pipe

Figure c – Typical horizontal 4” Vent installation

gP100-150 & gP100-200

Figure a – Typical horizontal 3” Vent installation

§

§

§

§

§

§

Inlet

Outlet

Sheet Metal Shield on Brick or

Masonry Walls

Outside of

Building Wall

§

Mortar or

Silicone Caulk

From Water

Heater

3” Vent

Pipe

3” Pipe

Coupling

Vent Terminal with

1

/

2

"

Mesh Protective

Screen Inside

3” Pipe

Coupling

3” Vent

Pipe

§

§

§

§

§

§

Inlet

Outlet

Sheet Metal Shield on Brick or

Masonry Walls

Outside of

Building Wall

§

Mortar or

Silicone Caulk

From

Water

Heater

4” Vent

Pipe

Vent Terminal with

1

/

2

"

Mesh Protective

Screen Inside

3” Vent

Pipe

4x3 Reducer

Coupling

4x3 Reducer

Coupling

Figure b – Typical horizontal 4” Vent installation

Additional Considerations (See Figure 9)

1. Do Not install vent terminal under any patio or deck.
2. To help prevent moisture from freezing on walls and

under eaves, do not locate vent terminal on the side of a

building with prevailing winter winds.

3. Do Not terminate vent pipe directly on brick or masonry

surfaces. Use a rust-resistant sheet metal backing plate

behind vent. (See Figure 9.)

4. Do Not locate vent terminal too close to shrubbery,

since flue gases may damage them.

5. Caulk all cracks, seams and joints within six (6) feet of

vent terminal.

6. All painted surfaces should be primed to lessen the

chance of physical damage. Painted surfaces will require

maintenance.

7. Insulate vent pipe exposed to cold conditions (attics,

crawl spaces, etc.) to help prevent moisture from accu-

mulating in vent pipe.

moisture in the flue gas will condense as it leaves the

vent terminal. in cold weather this condensate can

freeze on the exterior wall, under the eaves and on

surrounding objects. Some discoloration to the

exterior of the building is to be expected. however,

improper location or installation can result in se-

vere damage to the structure or exterior finish of the

building.

HORIZONTAL VENT INSTALLATION – Once the vent terminal

location has been determined, make a hole through the exterior wall to

accommodate the vent pipe. Vent pipe must exit exterior wall horizontally

only. (See Figures 9a and 9b.)

Insert a small length of vent pipe through the wall and connect the

coupling as shown in Figure 9. Connect terminal as shown to the vent

pipe on the exterior of the building. Seal any opening around the vent

pipe or fittings with mortar or silicone caulk as shown in Figures 9a and

9b.

Complete the rest of the vent pipe installation to the water

heater’s vent connector fitting on the blower outlet. If

necessary support horizontal run as previously mentioned.

WARNING

!

Inlet

Outlet

Inlet Min. 6”

above

outlet

Figure 8 – Vertical Vent Terminal location

Short Piece of Vent Pipe

Min. 12" Above Roof
Min. 12" Above Anticipated

Snow Level.
Max. 24" Above Roof

(Without Additional Support)

Vent Pipe

Through Roof

Elbows

Figure 6

6” above outlet

Min. 7”
Max. 24”

Inlet