NEVER use open flame to test for gas leaks, as bodily injury or

property damage could result.

PRESSURE TESTING THE GAS SUPPLY SYSTEM — The water

heater and its manual gas shut-off valve MUST be disconnect-

ed from the gas supply piping system during any high pressure

testing of that system at pressures in excess of 1/2 psi

(14” w.c. / 3.5 kPa).

The water heater MUST be isolated from the gas piping system

by closing the manual gas shut-off valve during any pressure test-

ing of the gas supply piping at pressures equal to or less than

1/2 psi (14” w.c. / 3.5 kPa).

5. VENTING —

The water heater must be vented to the outdoors as described

in these instructions. DO NOT connect this water heater to an

existing Vent or Chimney it must be vented separately from all

other appliances.

Failure to properly vent the water heater to the outdoors as outlined

above and in the following section can result in unsafe operation of

the water heater causing bodily injury, explosion, fire or death.

To avoid the risk of fire, explosion or asphyxiation from carbon

monoxide, NEVER operate this water heater unless it is properly

vented and has an adequate air supply for proper operation. The

vent pipe must overlap a minimum of ½" on each connection. it is

important that the vent pipe engages fully into any pipe fitting and

be kept in that position until the adhesive has fully cured. DO NOT

drill or punch holes in the plastic pipe or fittings.
NOTICE: This unit can be vented using only the following

recommended pipe material. Use only 3- or 4-inch diameter pipe.

PVC (Schedule 40, ASTM D-1785)

CPVC (Schedule 40, ASTM F-441)

ABS (Schedule 40, ASTM D-2661)

The fittings, other than the VENT TERMINAL, should be equiva-

lent to the following:

PVC (Schedule 40 DWV, ASTM D-2665)

CPVC (Schedule 40 DWV, ASTM F-438)

ABS (Schedule 40 DWV, ASTM D-2661)

The unit may be vented horizontally through a wall or vertically through

the roof. Pipe runs must be adequately supported along both vertical

and horizontal runs. Maximum unsupported span is recommended to

be no more than 4 feet. It is imperative that the first hanger be located

on the horizontal run immediately adjacent to the first 90-degree elbow

from the vertical rise or at the blower outlet in the case of a horizontal

blower position. Support method used should isolate the vent pipe from

floor joists or other structural members to help prevent the transmission

of noise and vibration. Do not support, pin or otherwise secure the vent-

ing system in a way that restricts the normal thermal expansion and

contraction of the chosen venting material.

If the water heater is being installed as a replacement for an existing

power vented water heater, a thorough inspection of the existing venting

system must be performed prior to any installation work. Verify that the

correct materials, as detailed above have been used, and that the mini-

mum or maximum vent length and terminal locations as detailed in this

manual have been met. Carefully inspect the entire venting system for

any signs of cracks or fractures, particularly at the joints between elbows

or other fittings and the straight runs of vent pipe. Check the system for

signs of sagging or other stresses in the joints as a result of misalignment

of any components in the system. If any of these conditions are found,

they must be corrected in accordance with the venting instructions in this

manual before completing the installation and putting the water heater

into service.

VENT PIPE CONNECTION —

The blower assembly is preinstalled at the factory, so all that is required

for connecting the vent system is attaching the vent pipe to the blower

and the PVC Tee. Before starting the vent installation, careful planning

should be given to the routing and termination of the vent pipe. The length

of the vent pipe (inlet and outlet) should be kept to a minimum. Also, see

page 10 & 12 for vent terminal placement. The GP100-150 & GP100-200

model can be vented using either 3 inch or 4 inch Schedule 40 PVC pipe

and fittings.

To use 3 inch PVC, you can connect directly to the blower outlet (rubber

coupling provided for outlet connection) and PVC Tee. Make sure that

clamps on rubber coupling are tight, after the pipe is installed. The inlet

vent pipe should be cemented into the PVC Tee.

If 4 inch PVC pipe is going to be used, then it will be necessary to have

a short piece ( at least 3 inches long ) of 3 inch PVC pipe to join into the

coupling and tee. Then a 4 X 3 reducer would need to be joined to the

short piece of pipe, so that the 4 inch pipe could be used. The 4 inch pipe

will then need to be stepped back down, using a 4 X 3 reducer, to 3 inch

PVC. To install the vent terminals, a short length of 3 inch (maximum of

16 inches long) pipe will need to be used. (Refer to Figure 9b on page

10.)

The GP100-250 model can only be vented using 4 inch Schedule 40 PVC

pipe and fittings. The 4 inch pipe can be connected directly to the blower

coupling and 4 inch tee.

8

installation

WARNING

!

WARNING

!

WARNING

!

WARNING

!

Outlet

Vent Connection

Inlet

Vent Connection

Figure 5.

Vent Pipe Connection locations