Chapter 3 operation, Power on – RAD Data comm ASM-20 User Manual

Page 31

Advertising
background image

Controls and Indicators

3-1

Chapter 3
Operation


This chapter:
• Describes the controls and indicators of ASM-20 and their functions
• Explains the operation procedures
• Provides jumper and switch information.
Installation procedures given in

Chapter 2, Installation and Setup

must be

completed and checked before attempting to operate the ASM-20.

3.1

Power On

Apply AC power by connecting the AC power cord to an acceptable AC source.
The PWR LED should light up, indicating that the ASM-20 is on. If the local and
remote ASM-20 units are in operation and passing data, the following indicator
conditions will exist:
• PWR: On
• RTS: On

or

Flashing

• TD: Flashing

or

Off

• RD: Flashing

or

Off

• DCD: On or Flashing
• TEST: Off.
If you do not obtain the above LED indications following initial power on, check
that the three test push buttons are not depressed.

3.2 Controls

and

Indicators

All controls (push button switches) and LED indicators are located on the ASM-20
front panel. Their functions are described in

Table 3-1

and correspond to the

identification numbers in

Figure 3-1

and

Figure 3-2

.

Advertising