Sequence of operations – Rheem HE80-130LP User Manual

Page 26

Advertising
background image

26

Sequence of Operations

Fill tank

Ensure gas connections are present and no leaks

Ensure water heater is properly vented

YES

LINE

See Flashing LED table

24 VAC

ECO/VENT SWITCH

CONTROL HEALTH

YES

LINE

See Flashing LED table

24 VAC
ECO/VENT SWITCH
CONTROL HEALTH
WATER TEMPERATURE

YES

LINE

See Flashing LED table

24 VAC
ECO/VENT SWITCH
CONTROL HEALTH
WATER TEMPERATURE
COMB BLOWER

YES

LINE

See Flashing LED table

24 VAC
ECO/VENT SWITCH
CONTROL HEALTH
WATER TEMPERATURE
COMB BLOWER
PRESSURE SWITCH

YES

LINE

See Flashing LED table

24 VAC
ECO/VENT SWITCH
CONTROL HEALTH
WATER TEMPERATURE
COMB BLOWER
PRESSURE SWITCH
IGNITER ELEMENT

YES

Tank is cold, full of water, gas supply is connected to
gas control valve and heater is connected to a
120 VAC circuit. Gas valve is set to the ON position.

None. No power has been
applied.

System Lights (LEDs)

Flashing LED indicates a

problem

Action

Thermostat calls for heat. Water temperature inside
the tank has dropped more than 4˚ below the
thermostat setting.

Combustion blower is powered for a 40 second pre-
purge cycle.

Once there is sufficient combustion airflow, the
pressure switch activates.

Turn electric to main power to ON. The control will
display "00" which is a diagnostic check; then "120"
which is the control voltage; then "08" which means
plus or minus setting is 8˚ (4˚ above and 4˚ below)
from thermostat setting; then "??" where ?? is the
temperature of the water in the tank.

Igniter begins 30 second warm up period.

NO

NO

NO

NO

NO

TROUBLESHOOTING

NO

Unit is polarity sensitive. Ensure GREEN polarity LED on
main control board is on.

Advertising
This manual is related to the following products: