Caution, Warning, Mobile home installation – Quadra-Fire 3100 31M-ACC-MBK User Manual

Page 20

Advertising
background image

Page 20

7033-277C

March 2, 2007

R

3100 Wood Stove Series (ACC)

Figure 20.1

SparkArestor Cap

Roof Flashing

Storm Collar

Joist Shield/Firestop

Double wall
connector pipe

Floor Protector

Outside Air Floor Vent

OutsideAir
Rear Vent

CAUTION

Maintain structural integrity of mobile home:

• Floor, wall, ceiling and/or roof.

Do NOT cut through:
• Floor joist, wall, studs or ceiling trusses.
• Any supporting material that would affect the structural

integrity.

Never install in a sleeping room.

Consumes oxygen in the room.

WARNING

Asphyxiation Risk.

6

Mobile Home Installation

10. Burn wood only. Other types of fuels may generate

poisonous gases (e.g., carbon monoxide).

11. If unit burns poorly while an exhaust blower is on in

home, (i.e., range hood), increase combustion air.

12. Installation shall be in accordance with the Manufacturers

Home & Safety Standard (HUD) CFR 3280, Part 24.

1. An outside air inlet must be provided for combustion See

page 14 for installation information.

2. Appliance must be secured to the mobile home structure

by bolting the pedestal through hearth pad and into
fl oor.

3. Appliance must be grounded with #8 solid copper

grounding wire or equivalent and terminated at each end
with N.E.C. approved grounding device.

4. Appliance must be installed with an approved UL103 HT

ventilated chimney connector, UL103 HT chimney, and
terminal cap with spark arrestor. Never use a single wall
connector (stove pipe) in a mobile home installation. Use
only double-wall connector pipe, Dura-Vent DVL, Selkirk
metalbestos DS or Security DL double-wall connector or
any listed double-wall connector pipe.

5. In Canada, this appliance must be connected to a 6 inch

(152mm) factory-built chimney conforming to CAN/ULC-
629M, STANDARD FOR FACTORY BUILT CHIMNEYS.

6. Follow the chimney and chimney connector manufacturer’s

instructions when installing the fl ue system for use in a
mobile home.

7. Maintain clearance to combustibles.

8. Floor protection requirements must be followed

precisely.

9. Use silicone to create an effective vapor barrier at the

location where the chimney or other component penetrates
to the exterior of the structure.

NOTE: Offsets from the vertical, not exceeding 45°, are
allowed per Section 905(a) of the Uniform Mechanical Code
(UMC). Offsets greater than 45° are considered horizontal
and are also allowed, providing the horizontal run does not
exceed 75% of the vertical height of the vent. Construction,
clearance and termination must be in compliance with the
UMC Table 9C. This installation must also comply with NFPA
211.

NOTE: Top sections of chimney must be removable to allow
maximum clearance of 13.5 feet (411cm) from ground level
for transportation purposes.

You must use a Quadra-Fire Outside Air Kit Part
OAK-ACC and (depending on fl oor installation,
Part SRV7033-041) for installation in a mobile
home.

Advertising
This manual is related to the following products: