TESTING & SERVICE

(continued)

3--2

MANUAL LOAD TRANSFER

This procedure will manually transfer the load if the

controller is disconnected.

Do not manually operate the transfer switch

until both power sources are disconnected:

open both circuit breakers.

!

1. Open normal and emergency source circuit breakers.

2. Use the maintenance handle to manually operate

transfer switch to the opposite source. See page 1–3,

Manual Operation Test

.

3. If the transfer switch is in the Emergency position

manually start the engine generator and then close

the emergency source circuit breaker.

TROUBLE-SHOOTING

Note the control features that are activated or furnished

on the switch and review their operation. Refer to Section

5, Control Features.

Proceed with care!

The automatic transfer switch is energized.

!

Table 3-1. Trouble-Shooting Checks.

PROBLEM

CHECK IN NUMERICAL SEQUENCE

PROBLEM

1 OPERATION

2 GEN-SET

3 VOLTAGE

Gen-Set does not start when

the

TRANSFER SWITCH TEST

button is pressed and held for

15 seconds or when the

normal source fails.

Hold the

TRANSFER SWITCH

TEST button 15 sec. or the

outage must be long enough

to allow for the 1 or 3 sec.

Momentary Normal Source

Outage Delay plus engine

cranking and starting time.

Starting control must be in

automatic position. Batteries

must be charged and

connected. Check wiring to

engine starting contacts.

Transfer switch does not

transfer the load to

emergency source after the

gen-set starts.

Wait for

Transfer to Emergen-

cy Delay (0 to 5 min.) to time

out. For immediate transfer,

press the

BYPASS TIME

DELAY button. If Motor Load

Transfer is active, wait for in-

phase condition (see below).

Generator output circuit

breaker must be closed.

Generator frequency must be

at least 57 Hz.

Voltmeter should read at

least 90% of nominal phase to

phase voltage between

transfer switch terminals EA

and EC (or EL1 and EL2 for 2

pole switches). *

* These are factory settings.

Transfer switch does not

transfer the load to normal

source when normal returns

or when

TRANSFER SWITCH

TEST button is released.

Wait for

Retransfer to Normal

Delay (1 sec. to 30 min.) to

time out. For immediate re–

transfer, press

BYPASS TIME

DELAY button. If Motor Load

Transfer is active, wait for in-

phase condition (see below).

Voltmeter should read at least

90% of nominal phase to

phase voltage between

transfer switch terminals NB

and NC, NC and NA, and NA

and NB (or NL1 and NL2 for 2

pole switches).

Gen-Set does not stop after

load retransfer to the normal

source.

Wait for the 5 minute

Unloaded Running Delay to

time out.

Starting control must be in

automatic position.

Trouble-Shooting the Motor Load Transfer Feature (refer to page 5–3)

Use extreme caution when using a meter

to measure voltages in the following

steps. Do not touch power terminals;

shock, burns, or death could result !

1. Connect a voltmeter (set for twice system

phase–to–phase voltage) between Transfer Switch
terminals NA and EA.

2. Manually start generator. Voltmeter needle should

sweep back and forth at a regular rate between 0 and
about twice system voltage.

3. Press and hold TRANSFER SWITCH TEST button.

The load should transfer to emergency source when
meter needle is near 0 volts. If transfer does not
occur, Motor Load Transfer feature is not operating.

4. Release the Transfer Switch Test button. The load

should retransfer back to the normal source after the
Retransfer to Normal Delay

, if used. The retransfer

should occur when the needle is near 0 volts. If
retransfer does not occur after the time delay, the
Motor Load Transfer feature is not operating.

5. For immediate retransfer, press the BYPASS TIME

DELAY button. Then disconnect the voltmeter.

If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies