Maintenance, Owner – Trane IntelliPak SCWG 020 User Manual

Page 106

Advertising
background image

106

SCXG-SVX01B-EN

Inlet Guide Vanes

Perform the following procedure every
six months for proper inlet guide vane
operation:
1. Spray all parts of guide vane assembly

with WD40.

2. Spray all steel parts of guide vane

assembly with ZRC.

3. Spray hubs and moving parts with dry

silicone lubricant (Mobil Mobilux 2, Shell
alvonia 2, or equivalent).

Maintenance

On occasion, the inlet guide vane actuator
or inlet guide vanes may need to be
removed. For proper adjustment of inlet
guide vanes and/or actuator, see Figure
O-M-8.

Note: Perform this procedure monthly if
the unit is in a coastal area or corrosive
environment.

Figure O-M-8. Proper adjustment of inlet guide vanes.

Owner

Advertising