Pre-startup requirements, Installation – Trane IntelliPak SCWG 020 User Manual

Page 62

Advertising
background image

62

SCXG-SVX01B-EN

Connecting to Tracer Summit

®

IntelliPak

®

self-contained units operate

with Trane building automation software,
Tracer Summit

®

version 10.0.4 or later or

any OS2 operating system.

Tape the non-insulated end of the
shield on shielded wire at the
unit. Any connection between the
shield and ground will cause a
malfunction. If daisy-chained in
the unit, splice and tape the
shields to prevent contact with
ground.

ƽ

ƽ

ƽ

ƽ

ƽ

CAUTION

!

Pre-Startup
Requirements

Communication Wiring

Note: Communication link wiring is a
shielded, twisted pair of wire and must
comply with applicable electrical codes.

An optional communication link provides
a serial communication interface (SCI)
between Tracer Summit

®

and each

commercial self-contained (CSC) unit in
the system. The CSC system can have a
maximum of 12 CSC units per connection
link to Summit

®

. Use a single 18 AWG

shielded, twisted pair wire with stranded,
thinned copper conductors to establish
each communication link between
Summit

®

and each unit.

Installation

Advertising