12.1 Power Connection:

A

A

Figure 12.1

Removing Front Panel:
• Remove the front panel

by removing screws A
and sliding the front
panel up and away from
the boiler

Removing Side Panel:
• Remove screws B

B

B

C

C

B

B

Figure 12.2

Removing Control Panel:
• Remove screws C.

Figure 12.3

• Move the lower part of

the side panels (figure
12.3).

• Pull the control panel.

When completely pulled
out, the panel can rotate
45° downward.

D

D

D

Figure 12.4

• Loosen screws D and

remove the service
panel (Fig. 12.4).

For the electrical connection to the boiler use electric wires which conform to local
regulations.

12.2 Connection to the electricity supply:

• Connect the electrical supply cable coming from the fused spur isolation switch to the

power supply terminal block of the boiler (as shown in figure 12.5) keeping the same
connections for the live wire and the neutral wire.

1

2

L

N

3

To fused spur
isolation switch

Power supply
terminal block

External controls
terminal block

120 VAC

15 AMP BREAKER

Service Man's Switch

Fire - O - Matic

23

Figure 12.5

• Connect the earth wire(yellow/green). Boiler must be wired directly to earth ground on

breaker panel.

Note: Do not connect live wires to

thermostat terminals 1-3.

WARNING

RIVA HEAT ONLY MANUAL - REV A