15. Commissioning Cont.



15.8 Labels placement:

1

4

2

3

5

Figure 15.10

Warning: The installation is not complete unless labels supplied are placed on the

boiler as shown in Figure 15.10.


All the labels supplied with the boiler are numbered for reference.
According to Figure 15.10 place all the labels on the boiler. Use label numbered as 1
(already installed in the front panel) to begin the placement in the correct way.