York SUNLINE K4EU120A50A User Manual

Page 11

Advertising
background image

Unitary Products Group

11

550.39-N4YI

MOTOR SPECIFICA-

TIONS

•1450 RPM

•380/415-3-50

•Solid base

•56 Frame

•Inherently protected

Permanently lubricated

ball bearings

POWER AND CONTROL WIRING

Install electrical wiring in accordance with applicable national,
local and municipal codes. The unit should be grounded in ac-
cordance with these codes.

Remove the 1

3

8

" (35mm) knockout from the unit rear panel.

Route the power wiring conduit through this opening. Connect
the conduit to the required field-supplied fitting and the power
wiring to blower motor contactor 10M in unit control box.

If the unit includes an electric heat accessory, route the power
wires into heater control box instead of the unit. Refer to the
electric heat instructions for additional installation information.

Model

Motor

(HP/kW)*

Blower

Range
(RPM)

Adjustable Motor Pulley

Fixed Blower Pulley

Belt

Pitch Dia

(In./mm)

Bore

(In./mm)

Pich Dia.

(In./mm)

Bore

(In./mm)

Designa-

tion

Pitch Lg.

(In./mm)

KEU090

1

1

2

/ 1.1

650/850

3.4 - 4.4 /

86 - 112

7

8

/ 22.2

7.5 / 190

1 / 25

A37

38.3 / 973

KEU120

2 / 1.5

700/910

3.4 - 4.4 /

86 - 112

7

8

/ 22.2

7.0 / 178

1 / 25

A37

38.3 / 973

TABLE 7 - BLOWER MOTOR AND DRIVE DATA

*All motors are 1450 RPM and have a 56 frame, inherent protection and permanently lubricated ball bearings The motors have a solid base and a 1.15 serv-
ice factor. All 3-phase motors are wired for 380/415V power supply.

CONTROL WIRING

Route the low voltage control wiring through the

7

8

" (22.2mm)

hole (with bushing) in the units rear panel. Add

1

2

" (25mm) con-

duit fitting to the

7

8

" (22.2mm) hole in the unit control box, route

control wiring through this opening and connect them to the ter-
minals on block 4TB.

Refer to Table 6 to size the disconnect switch, the power wiring
and the fuses. Refer to Figure 10 for typical field wiring.

NOTE: Three phase motor rotation may be incorrect when the

unit is first started up. Reverse phase (leads L1 and

L2) at contactor to obtain the correct rotation.

FIG. 10 - TYPICAL FIELD WIRING (Cooling only)

TERMINALS ON BLOCK 3TB OF
THE BLOWER UNIT

TERMINALS ON
1 - S TA G E

C O O L I N G

THERMOSTAT
2TH0870124

LUG ON NEUTRAL TERMI-
NAL BLOCK

4 - WIRE

Advertising
This manual is related to the following products: