Installation instructions, Commissioning – Yeoman EXE MIDI PR1145 User Manual

Page 14

Advertising
background image

14

INSTALLATION INSTRUCTIONS

COMMISSIONING

1. COMMISSIONING

After connecting the gas pipe to the stove:

1.1 PURGE THE SUPPLY PIPE to dispel any debris that might

block the controls.

1.2 Connect the gas supply to the 8mm compression elbow

at the right-hand rear corner of the stove (see Diagram 1).

AR0934

1

1.3 Connect a suitable pressure gauge to the test point on

the inlet fitting.

1.4 Turn on the gas supply.

1.5 Light the stove and check all gas joints for leaks.

1.6 Turn the stove to maximum to check the supply pressure

corresponds with the data badge information.

1.7 Turn the gas off.

1.8 Replace the test point screw.

1.9 Turn the gas on.

1.10 Check the test point for leaks.

To finish commissioning:

1.11 Check the stove complies with all local regulations.

1.12 Check all seals are in good condition.

1.13 Complete the Appliance Commissioning Checklist on

page 3.

1.14 Show the user how to operate the stove.

1.15 Hand the completed instructions to the User for safe

keeping. The information is required when making any

guarantee claims.

Advertising