Canada, Latin america, Asia pacific – 3Com Powerware Uninterruptible Power System Prestige Series User Manual

Page 84

Advertising
background image

AS/400 Service

78

Powerware

®

Prestige Series Installation and Operator’s Manual for IBM Applications (3000 VA) Uncontrolled Copy

Handling of Incomplete, Damaged, or Incorrectly Shipped 9910
UPSs

If the customer initially receives a 9910 UPS that is incomplete,
damaged, or incorrectly shipped:

1. The customer calls IBM at 1-800-IBMSERV to report the

problem.

2. An IBM representative notifies the customer of how the

problem will be resolved.

Canada

Customer Process for Service

1. Customer calls 1-800-426-7378.

2. Dispatch takes the information from the customer and notifies

the IBM Customer Service Representative (CSR).

3. Problem determination is performed by the CSR.

4. If a replacement unit is required, the unit is ordered out of

stock and sent to the customer.

5. The CSR does the swap and returns the defective unit to the

IBM parts center.

Latin America

Customer Process for Service

1. Customer calls the local IBM office servicing account.

2. The IBM CE responds, determines the problem, and resolves

the problem.

Asia Pacific

Customer Process for Service

1. Customer calls the local IBM office servicing account.

2. The IBM CE responds, determines the problem, and resolves

the problem.

Advertising