Test and fault isolation, General, A. applicability – ACR&Artex DGL-1 User Manual

Page 23: B. regulatory requirements, Inspection, A. periodic inspection

Advertising
background image

25-69-01

Page 23 of 44

JUN 27/12

ARTEX PRODUCTS / ACR ELECTRONICS, INC

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

DGL-1, DONGLE (453-4010)

TEST AND FAULT ISOLATION

TASK 25-69-01-750-801

1. General

SUBTASK 25-69-01-990-001

A. Applicability

(1)

This section only covers inspection, testing, and fault isolation procedures specific to the

Dongle.

(2)

Refer to the applicable ELT abbreviated component maintenance manual associated with the

ELT to coordinate the requirements herein with the requirements for inspection, test, and fault

isolation of the ELT system as a whole.

SUBTASK 25-69-01-990-002

B. Regulatory Requirements

(1)

The Dongle is considered an integral part to the ELT system, and as such is subject to the

periodic inspection and testing required by the regulatory authorities governing the

installation, operation, and maintenance of ELT systems.

(2)

Refer to the application ELT abbreviated component maintenance manual associated with the

ELT for references to the regulatory requirements.

(3)

Inspection and testing of the Dongle must be accomplished in conjunction with and on the

same schedule as the ELT and other system components.

TASK 25-69-01-750-802

2. Inspection

SUBTASK 25-69-01-990-001

A. Periodic Inspection

(1)

Remove the Dongle in accordance with “Removal” on page 27.

(2)

Perform a visual inspection of the physical integrity of the case, gasket, and DIP switches,

checking for:

(a)

Damage to the finish,

(b)

Corrosion,

(c)

Excessive wear of the mounting holes, and

(d)

Cracks in the mounting flanges.

Advertising