Installing the side rails, Installing the power unit – Activeforever Invacare microAIR Lateral Alternating Pressure Mattress & Compressor (microAIR Mattress with Compressor 36 x 80 x 15) User Manual

Page 11

Advertising
background image

SECTION 2—OPERATION

Part No 1148139

11

MA90 and MA95 Series Mattresses

FIGURE 2.1 Installing the Mattress Replacement System

Installing the Side Rails

ƽ WARNING

Patient entrapment with bed side rails may cause injury or death. Mattress MUST

fit bed frame and side rails snugly to prevent patient entrapment. Follow the

manufacturer’s instructions. Monitor patient frequently. Read and understand the

Owner’s/Operator’s Manual prior to using this equipment. Invacare product

manuals are available at www.invacare.com or your dealer.

NOTE: Refer to the instructions provided with the side rails for the installation procedure.

Installing the Power Unit

NOTE: For this procedure, refer to FIGURE 2.2.

1. Pull out the bed hook on the back of the 

control unit. 

2. Place the control unit on the footboard.

NOTE: If the bed does not have a footboard, 
place the control unit on a flat surface, leaving 
room for the hose to hang down.

FIGURE 2.2 Installing the Power Unit

Hose

Foot End

Head End

Powered Mattress

Buckle

Straps

NOTE: Mattress 
cover not shown for 
clarity.

Bed Hook

Advertising