Installing the side rails, Installing the power unit – Activeforever Invacare microAIR Lateral Alternating Pressure Mattress & Compressor (microAIR Mattress with Compressor 36 x 80 x 15) User Manual
Page 11
SECTION 2—OPERATION
Part No 1148139
11
MA90 and MA95 Series Mattresses
FIGURE 2.1 Installing the Mattress Replacement System
Installing the Side Rails
ƽ WARNING
Patient entrapment with bed side rails may cause injury or death. Mattress MUST
fit bed frame and side rails snugly to prevent patient entrapment. Follow the
manufacturer’s instructions. Monitor patient frequently. Read and understand the
Owner’s/Operator’s Manual prior to using this equipment. Invacare product
manuals are available at www.invacare.com or your dealer.
NOTE: Refer to the instructions provided with the side rails for the installation procedure.
Installing the Power Unit
NOTE: For this procedure, refer to FIGURE 2.2.
1. Pull out the bed hook on the back of the
control unit.
2. Place the control unit on the footboard.
NOTE: If the bed does not have a footboard,
place the control unit on a flat surface, leaving
room for the hose to hang down.
FIGURE 2.2 Installing the Power Unit
Hose
Foot End
Head End
Powered Mattress
Buckle
Straps
NOTE: Mattress
cover not shown for
clarity.
Bed Hook