Veris Technologies pH Manager - Operating Instructions User Manual

Page 30

Advertising
background image

Pub.# OM17-MSP-pH

4-1

SECTION 4

pH Manager Implement

Set-up and Field Operations

Implement Overview (MSP)

Figure 1




12 Volt Power and Hydraulics Set-up


If the unit has been crated and delivered via closed-van commercial freight, the tongue (if
equipped) may need to be installed prior to use. Prior to operating the implement for the first time,
it is important to check all fasteners

– some may have loosened during shipment. Route cables

(figure 2) and hydraulic hoses along tongue and through hose guide. Tie-strap securely. Connect
electrical cables to battery. Be careful to attach black cable to negative/ground terminal. DO NOT
REVERSE POLARITY.

External
controller

Furrow
closers

Tank and pumps
for electrode
cleaning

Wash
nozzles

Sampler shoe
and scraper

EC
coulter-
electrodes

Pull-tongue
(opt.)

Hyd. valves
(under tank)

Road kit (opt.)

Advertising