12v c 5v – Veris Technologies pH Manager - Operating Instructions User Manual

Page 55

Advertising
background image

Pub.# OM17-MSP-pH

6-10


Figure 2.2 External Controller circuit board (metal cover removed)

3. Test voltage coming out of External Controller to solenoids. Disconnect the weather-pack

connectors in line from Controller to the solenoids. Using a digital voltmeter set to read voltage,
insert leads into connector coming from Controller. Activate manual raise-lower switch and
read voltage. (Figure 4) Voltage should be 12 volts.





















Figure 2.3 Testing voltage on power leads to solenoid.

5V 2

SOLENOID
LED’s

12V C

5V

UP

DOWN

Advertising