Low-Voltage Box Wiring Details

Step 1: All low voltage wiring entering and exiting the low

voltage box must be routed through the bushings provided on

the box.

Step 2: Once all wiring is complete fill the bushings with R.T.V

or other equivalent sealant material.

Step 3: Wrap the outside of bushings and wiring with 3M, 130C

tape. Tape must extend down the wire bundle for a minimum

of 6 inches. Refer figure 14 for details.

WARNING: Ensure all wire way openings are properly

sealed before energizing.

Figure 14. Low-voltage box wiring.

Bushing Provided

for Customer Wiring

Purpose

Properly Sealed and

Taped Bushing

Figure 15. Apply sealer around the top perimeter of the shell.

Sealer

Plenum Installation Guide

The Limitamp AR design requires the use of a ventilation

plenum to route any arcing gases away from the equip-

ment. Each section requires a plenum and extra extension

plenum parts can be used to exhaust the arcing gases out

of the building. The plenum parts are shipped with the

equipment and it is the end user’s responsibility to install

the plenum part on the equipment.

Store the plenum or extension plenums on a level surface to

avoid distortion. Ensure pleum or extension plenums are kept

in clean and dry condition with ample air circulation.

NOTE: It is recommended NOT to store the plenum outdoors.

At the installation site, remove all separately packaged

components shipped within the Limitamp

AR unit. Find the

plenums, cover plates, mounting hardware and place them in

the work area. It is recommended that the plenum parts be

installed in the sequence listed below.

WARNING: Allow at least 12 feet of unobstructed space

for exhaust gases. Serious injury or death may occur.

Step 1: Before plenum installation begins remove all

plastic snap-in clips in top vent flaps to ensure vent flaps

operate properly.
Step 2: Apply a strip of sealer around the top perimeter of

the first shell. Sealer should be placed on the outside of the

mounting holes on the shell top.
Step 3: Lift plenum box for the first section with appropriate

means and place it on top of the unit taking care to not

damaging flaps on roof.