GE Industrial Solutions Limitamp AR User Manual

Page 9

Advertising
background image

Step 7: Apply sealer around perimeter of the other side of the

plenum and on the top of the second shell.

Figure 19. Application of sealer to plenum and shell.

Figure 20. Bolting the plenums together

Sealer

Bolts Installed

to Seal Joint

Step 8: Lift second plenum and position to align holes. Bolt the

second plenum in place. Install 3/8” hardware in all holes

between the plenums and to the top of the shell.

Step 9: Apply a layer of sealer on the bottom plate of the first

extension plenum. Attach bottom plate to the plenum.

Figure 21. Mount extension plenum bottom plate in place.

Sealer

Step 10: Apply a layer of sealer to the open end of the plenum

that is mounted on the end of the lineup. Lift the extension

plenum and hold it in place until bolts can be mounted to

attach the two plenums together. Extension plenum should be

supported by additional supports from the roof of the building.

Sealer

Figure 22. Assemble the extension plenum using

3/8” Hardware.

CR 194 One/Two-High Vacuum Limitamp

®

AR Control

Page 9

Advertising