GE Industrial Solutions Entelliguard TU, MicroVersaTrip Plus and PM Conversion Kits User Manual

Page 20

Advertising
background image

Figure 21. Cabling diagram for MicroVersaTrip Plus™ and MicroVersaTrip PM™ trip units with ground fault on four-wire

loads.

g

GE Industrial Systems

General Electric Company

41 Woodford Ave., Plainville, CT 06062

DEH40009 R07

© 2010 General Electric Company

These instructions do not cover all details or variations in equipment nor do they provide for every possible

contingency that may be met in connection with installation, operation, or maintenance. Should further

information be desired or should particular problems arise that are not covered sufficiently for the purchaser’s

purposes, the matter should be referred to the GE Company.

Advertising