3. Figure 4 (c)
With breaker closed loosen locking screw. Move

stabilizer ASM into engagement with breaker latch

and lock in place with locking screw.



Note:
The stabilizer assembly is slightly different for RL
version breakers, but can be adjusted in similar
manner as explained above.



Figure 5. Flux shifter mounting area.

Flux Shifter Test
The operation of the flux shifter may be tested by
closing the breaker, then applying 9 Vdc to the flux
shifter leads (red is positive). The breaker should trip
and reset. If necessary, repeat the adjustments in the
previous procedures.
















Figure 6. Flux shifter assembly installed, as viewed from the

bottom of the breaker (RL-1600 shown).

Figure 4 (b)

Figure 4 (c)

RL

mounting
plate [13]

Original breaker

reset spring

Breaker

Reset

Link

Trip

Paddle

Reset Spring

Mounting

Hole for

LA-Gold

Mounting

Hole for RL

Drill hole to

.257 dia for RL

only

Hole A

Hole B

Hole C