Infinity D Power System Installation Guide: -48V Plants
H2007001
Issue 2.0, June 3, 2009
22
Packaging
• All packages should be opened with a box cutter with the blade minimally exposed so
that only the sealing tape is cut.
• Save all packaging material until the system has been powered up and all parts are
operating within specifications
.
Installation Tools
You will need the following tools to install and test the Infinity D.
• Wire cutters and strippers
• Heat shrink gun
• 5/16-inch (8 mm) hex driver
• Digital meter with an accuracy of
±0.02%
• Screw drivers (flat-blade and
Phillips)
• ESD wrist strap
• 48 or/and 24V test load
• Calibrated clamp-on dc current
meter (0.1 ADC sensitivity)
• Torque wrench
• Socket wrenches:
• 7/16” and 9/16” for load and
battery connections;
• 19 mm for anchor bolts;
• 12" extension for socket
• Masonry drill kit as required
• Compression for installation of
various compression lugs
• Protective canvas
• Insulating rubber mat
• Standard insulated installation tools,
screwdrivers, etc.
• Required Insulated Tool Kit 1000v
DC Telecom set to include ESD
protection