GE Industrial Solutions H2007001 G21 Series User Manual
Page 36
Infinity D Power System Installation Guide: -48V Plants
H2007001
Issue 2.0, June 3, 2009
36
Step
Action
3.
Secure the Hot Lead for each battery string, starting from the middle of the bay and working to
the outside. Use a double hole lug with holes on 1 inch centers.
Hardware list for each termination is:
(2) 801273129 3/8-16 x 1in bolt
(2) 801829607 3/8-inch lockwasher
(2) 802841635 3/8-inch flatwasher
If required by local code or practice, treat with an oxidation inhibitor such as NO-OX.
Note: Landings are compatible with lugs with 1” hole spacing for 3/8” hardware.
4.
Use 9/16” socket. Torque each bolt to 240 in·lbs or 27Nm
5.
Replace Cover
6.
Re-torque screws to ~6 in·lbs ( 0.5 Nm)
7.
Loosen the four screws that secure the Return Termination cover located on the right side of the
Battery Connection Module.
Loosen