Wire loads served by gmt type fuses – GE Industrial Solutions H2007001 G21 Series User Manual

Page 51

Advertising
background image

Infinity D Power System Installation Guide: -48V Plants

H2007001

Issue 2.0, June 3, 2009

51

Wire Loads served by GMT Type Fuses

Step

Action

1.

Open the Converter or Rectifier System
Module door

2.

Locate Circuit Breaker (CB) mounting
panel.

3.

Install a 6 position GMT type fuse holder
in 2 Circuit Breaker distribution positions
(see picture)

4.

Terminate the return busbar according to
the instructions provided with the GMT
fuse holder kit.

5.

Complete installation and wiring
according to the instructions provided
with the kit.

Return

Termination

points

Advertising