GE Industrial Solutions H2007001 G21 Series User Manual

Page 42

Advertising
background image

Infinity D Power System Installation Guide: -48V Plants

H2007001

Issue 2.0, June 3, 2009

42

Step

Action

5.

Plug in Circuit Breaker:

6.

Mark the label to the left of the circuit breaker according to standard practice in your network.

7.

Feed a wire pair from the top of the bay down to the desired location.

8.

Locate and dress the pair to tie bars in the right back corner of the DC wiring area:














9.

Terminate the feeding lead on the circuit breaker lug landing using the hardware provided.

10.

Terminate the return on the return bus located on the back wall of the distribution area using the
hardware provided.

Advertising