Troubleshooting, Probes, Checking for defective vt-probes – GE Industrial Solutions H2007001 G21 Series User Manual
Page 74
Advertising
Infinity D Power System Installation Guide: -48V Plants
H2007001
Issue 2.0, June 3, 2008
74
Troubleshooting
VT
-Probes
Checking for Defective VT-Probes
(If a Voltage Channel Failure and/or Thermal Probe Failure alarm occurs)
Step
Action
1.
Disconnect the first probe from its RJ-45 terminal block.
2.
Run the command: MENU > CONTROL / OPERATIONS > UNINSTALL EQUIPMENT.
Is the system controller green Normal LED lit?
3.
Yes – Removed probe is defective. Replace it.
Finished.
No – Reinstall the removed probe. Proceed to
Step 4.
4.
Remove the next probe.
5.
Go to Step 2. Repeat steps for all probes.
Advertising