Troubleshooting, Probes, Checking for defective vt-probes – GE Industrial Solutions H2007001 G21 Series User Manual

Page 74

Advertising
background image

Infinity D Power System Installation Guide: -48V Plants

H2007001

Issue 2.0, June 3, 2008

74

Troubleshooting

VT

-Probes

Checking for Defective VT-Probes

(If a Voltage Channel Failure and/or Thermal Probe Failure alarm occurs)

Step

Action

1.

Disconnect the first probe from its RJ-45 terminal block.

2.

Run the command: MENU > CONTROL / OPERATIONS > UNINSTALL EQUIPMENT.

Is the system controller green Normal LED lit?

3.

Yes – Removed probe is defective. Replace it.
Finished.

No – Reinstall the removed probe. Proceed to
Step 4.

4.

Remove the next probe.

5.

Go to Step 2. Repeat steps for all probes.

Advertising