Infinity D Power System Installation Guide: -48V Plants

H2007001

Issue 2.0, June 3, 2009

37

Step

Action

8.

Lift off the Return Termination Cover to reveal the Battery Return lead termination bus bar.

9.

Secure the Return Lead for each battery string. Use the back bus bar, starting toward the middle
of the bay and working to the outside. Use a double hole lug with holes on 1 inch centers.
















Hardware list for each termination is:
(2) 801273129 3/8-16 x 1in bolt
(2) 801829607 3/8-inch lockwasher
(2) 802841635 3/8-inch flatwasher

If required by local code or practice, treat with an oxidation inhibitor such as NO-OX.
Note: Landings are compatible with lugs with 1” hole spacing for 3/8” hardware.

10.

Use 9/16” socket. Torque each bolt to 240 in·lbs or 27Nm

11.

Replace Cover