GE Industrial Solutions SG Series 225 & 300 Operating Manual User Manual

Page 46

Advertising
background image

Modifications reserved

Page 46/79

OPM_SGS_USM_M22_M30_2US_V010.doc

User Manual SG Series 225 & 300 UL S2

NOTE !

During the first commissioning SG Series 225 & 300 requests a set up of the UPS
configuration parameters presented in the following screens.

Without such configuration it is not possible to continue with the commissioning
procedure.


WARNING !

The setup of the UPS configuration parameters must be done only

by a GE GLOBAL SERVICES FIELD ENGINEER.
The setup of mistaken values could compromise the integrity and
reliability of the UPS.



In this mode the keys perform the following functions:



Confirm the selection made and select the next parameter.

ESC

Re-establish default value.

Modify or insert the selected value.

Save the configuration of set parameters.



`

Configuration

DISPLAY CONFIGURATION


Select language

:

ENGLISH

ESC



DISPLAY CONFIGURATION screen

Select language
This parameter allows the choice of language used to display

the information.

Pushing the pushbuttons “1

st

button” (METER) and “2

nd

button”

(ALARM) together automatically sets the LCD communication for
“ENGLISH”.


`

Configuration

UPS CONFIGURATION

Input frequency

:

60

Hz

Output frequency

:

60 Hz

Inverter voltage

:

277

V


ESC



UPS CONFIGURATION screen

Input frequency
Rectifier input frequency value.

The default value is 60Hz and shall not be changed.

Output frequency
Inverter output frequency value.

The default value is 60Hz and shall not be changed.

Inverter voltage
Output voltage PHASE/NEUTRAL of the inverter (default 277V).

Continue ►

Advertising