GE Industrial Solutions SG Series 225 & 300 Operating Manual User Manual

Page 52

Advertising
background image

Modifications reserved

Page 52/79

OPM_SGS_USM_M22_M30_2US_V010.doc

User Manual SG Series 225 & 300 UL S2

4. Open the Manual Bypass Switch Q2 (Pos. O).

The Load is supplied by the Utility through the Automatic Bypass.

LED 8 (Automatic Bypass ON) is lit and LED 9 (Manual Bypass Q2 ON) turns OFF.

The Synoptic Diagram must display the statusLOAD

SUPPLIED BY AUTOMATIC BYPASS.

5. Insert the Inverter by pressing the “Inverter ON” ( I ) key.

Soft-start of Inverter, indicated with blinking LED 5 (Inverter available).

At the end of Soft-start the LED 5 (Inverter available) remains lit.

Automatic transfer from Automatic Bypass to Inverter.

LED Alarm turn Off and the LED Operation must be lit.

The Synoptic Diagram must display the statusLOAD
SUPPLIED BY INVERTER
.

END OF PROCEDURE

Advertising