GE Industrial Solutions SG Series 225 & 300 Operating Manual User Manual

Page 66

Advertising
background image

Modifications reserved

Page 66/79

OPM_SGS_USM_M22_M30_2US_V010.doc

User Manual SG Series 225 & 300 UL S2

`

Home\Commands

COMMANDS

RESET

TOTAL

OFF

REQUEST TOTAL OFF

V



3. Perform the command “Load Off” on the Unit to

separate only when the LED 7 (Q1 closed) is Off.

Perform the command “Load Off” by entering the screen

(see Section 7.5):
COMMANDS / REQUEST TOTAL OFF

Synoptic Diagram of the unit to separate

Synoptic Diagram of other units

4. Disconnect the Battery on the Unit to separate by opening (Pos. O) the External Battery Switch

or Fuses.

Wait 5 minutes for DC-Link Capacitors discharge.

5. Disconnect the Utility supply on the Unit to separate.

Complete power shutdown will OFF the LCD Display Panel.

Synoptic Diagram of the unit to separate

Synoptic Diagram of other units

END OF PROCEDURE



DANGER !

It will take 5 minutes for the DC capacitors to discharge.
Open only the front door, do not open any other part of the UPS.


NOTE !

For any further intervention contact nearest Service Center.

Advertising