Front side, Openings for input and output cable connections, These openings are covered with a protective plate – GE Industrial Solutions SG Series 225 & 300 Installation Guide User Manual

Page 13

Advertising
background image

Openings for input and output cable connections

SGS

_22

5-3

00_

S2_

UPS

view

top

_01

US

1,650mm

64.96"

160mm

6.30"

2.76

"

40mm

1.58"

70m

m

31.5

0"

21.6

6"

550

mm

800

mm

Utility input
Output Load

Battery

Fig. 3.4.1-2 Opening on top of the cabinet for input and output cables

SG Series 225 & 300
openings are provided
on the top and the
bottom of the UPS for
the connection of input
and output cables.

Pay attention to the
position of these
openings, when
choosing the placement
of the UPS.

Utility input
Output Load

6.30"

160mm

1.77"

550

mm

21.6

6"

800

mm

31.5

0"

100

mm

3.94

"

1,650mm

64.96"

SGS

_22

5-3

00_

S2_

UPS

view

bot

tom

_01

US

45mm

Fig. 3.4.1-3 Opening on the bottom of the cabinet for input and output cables

These openings are
covered with a
protective plate.


Fixing of the UPS cabinet on the floor
The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor. See Fig. 3.4.1-4.

62.205"

1580mm

35mm

713

mm

28.

071"

60

mm

2.

363"

60

mm

2.36

3"

680

mm

26.

772"

1.378"

1.378"

35mm

=

Ш 0.47"

Ш 12mm

=

Front side

SGS_225-300_S2_UPS view bottom_02US

Fig. 3.4.1-4 Fixing of the UPS cabinet on the floor

Modifications reserved

Page 13/40

OPM_SGS_ISG_M22_M30_2US_V010.doc

Installation Guide SG Series 225 & 300 UL S2