3.9.3 Control bus cable location

WARNING !

This operation must be performed by QUALIFIED SERVICE PERSONNEL ONLY before
the initial start-up.

ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.


Q1

Q2

SGSU_225

-300_S2_R

PA control

bus cable

_01

A

2

4

3

1

-

-

8 9 10

21

20

19

11

22

1

2

3

4

1 2 3 4 5

16

15

14

13

12

6

17

7

18

Fig. 3.9.3-1 View electronic module on intermediate unit

Access to the control bus
connection.


The control bus connection
between parallel units must be
made on the front of the

electronic module fitted
behind the front doors.

To properly route the control
bus cables the safety screen

A” must be removed.


JB1
JB2

JA1
JA2

A

Next parallel unit

A

JA

JB

SGSU_225-300_S2

_RPA control bus c

able_02US

Fig. 3.9.3-2 Front view electronic module on intermediate unit

Control bus cables connection.


• Plug the cables JA (1/2/3/4/5) and JB

(1/2/3/4/5) onto the RJ connectors JA and
JB located on parallel bus PCB P34 – Bus
Interface
(going to “P13 – RPA Board”
J52(A) and J62(B).

• Fix both cables JA (1/2/3/4/5) and JB

(1/2/3/4/5) to parallel bus socket
connecting the cable shield to ground by

means the cable clamps “A“.

Modifications reserved

Page 34/40