2 power connection with common input utility, Power connection with common input utility – GE Industrial Solutions SG Series 225 & 300 Installation Guide User Manual

Page 23

Advertising
background image

3.8.2 Power connection with common input utility

SGS_2

25-30

0_S2_

UPS c

onnec

tion co

mmon

_GE_0

1US

A

A

PE

Input utility

PE Load

LO

AD

N

L3

L2

L1

N

L3-1

L2-1

L1-1

1 -

IN

PU

T R

EC

TIFIER

&

B

YPASS

PE Input utility

PE Load

common NEMA two hole lugs

Typical installation using

Fig. 3.8.2-1 Power connections Common Input Utility



Fix the cables on accessory “A” with the enclosed cable ties.
Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for input/output and DC power connections on Bus Bars: see Section 3.8.1.

Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

L2-1

Rectifier + Bypass Phase B

L3-1

Rectifier + Bypass Phase C

N

Utility Neutral

PE Input Utility

Ground

The interconnection bus bars BR1, BR2 and BR3 MUST REMAIN CONNECTED (see Fig.
3.8.3-3)
.


Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE Load

Load Neutral

Load Ground


Modifications reserved

Page 23/40

OPM_SGS_ISG_M22_M30_2US_V010.doc

Installation Guide SG Series 225 & 300 UL S2

Advertising