Q1

Q2

1

2

3
4

Q1

Q2

UPS 1

UPS 2

Next parallel

unit 3, 4, 5, 6

JA1

JB1

JA

JB

JB1

JA1

JA2

JB2
JA1

JB1

JB

JA

JB2

JA2

3

4

1

2

3

4

1
2

SGSU_225

-300_S2_R

PA control

bus cable

_03US

12

1

13

2

5

14 15

3

4

16

22
11

17

6

18

7

21

8

9

19 20 10

3
4

2

1

6

18

7

12

1

13

2

5

14 15

3

4

16 17

22

11

21

8 9
19 20 10

Fig. 3.9.3-3 Control bus cable routing and connection


Control bus cables routing

Place and fix the cables JA-1/2/3/4/5 and JB-1/2/3/4/5 inside the UPS cabinets in the position
illustrated in the drawing.

NOTE !

Pay attention when cabling and routing the bus cables JA and JB inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables JA
and JB must be removed from the cabinet without disconnecting them from the
metal plate where the sockets JA
and JB are located.


For reliability reasons the cables JA-1/2/3/4/5 and JB-1/2/3/4/5 connecting the units should be run
in separated protected conduits (as indicated in Fig. 3.9.3-3) separated from the power cables.

It is important that the cable JA must be the same length as cable JB.



WARNING !

Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a GE SERVICE ENGINEER from of your

Service Center.