4 battery and external battery breaker connection, Battery and external battery breaker connection, Battery – GE Industrial Solutions SG Series 225 & 300 Installation Guide User Manual

Page 28

Advertising
background image

3.8.4 Battery and External Battery Breaker connection

_

+

Q1

0 OFF I O

N

Q2

0 OFF I O

N

BATTERY

PE

SGS_225-300_S2_U

PS connection batte

ry_01US

19

17 18

6

7

20

9

8

21

10

22

11

15

14

3 4

16

5

1
2

3

4

1
2

3
4

Typical installation using
common NEMA two hole lugs

Fig. 3.8.4-1 Power connections Battery


Fix the cables on accessory “A” with the enclosed cable ties (see Fig. 3.8.2-1).
Battery Cable Terminations are to the Positive and Negative Terminals as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for Input/Output and DC power connections on Bus Bars: see Section 3.8.1.

Battery connection

+

Positive pole of the battery

-

Negative pole of the battery

Do not insert the Battery Fuses before the
commissioning!

PE

Battery ground

NOTE !

To meet standards concerning electromagnetic compliance, the connection
between the UPS and external Battery
must be done by using a shielded cable or
suitable shielded (steel) conduit!

External Battery Breaker Release

Fig. 3.8.4-2 External battery breaker connection

For connection or disconnection of the
Battery an external breaker CB with UVR
is required.

The UVR of the external breaker must be
connected to terminal XA (see Fig. 4.1.6-1).

The release signal will allow, after the
Rectifier soft-start, the manual closure of
the breaker.

In either case, fuses or breaker, an auxiliary contact must signalize the closure of breaker or fuse
holder to Input channel 1 of the P4 - Customer Interface (see Section 4.1).
Contact must be open with Battery disconnected (Normally Open).

Modifications reserved

Page 28/40

OPM_SGS_ISG_M22_M30_2US_V010.doc

Installation Guide SG Series 225 & 300 UL S2

Advertising