3.8.3 Power connection dual input utility (option)

A

PE Load

PE

Input utility

L1

LO

AD

L2

L3

N

PE Load

PE Input utility

1 - I

N

PUT REC

TIFIER

L2-1

L3-1

L1-1

N - Bypass

2 - IN

PU

T BY

PA

SS

(opti

on)

L3-2

L2-2

Typical installation using
common NEMA two hole lugs

L1-2

A

SGS_2

25-30

0_S2_

UPS co

nnectio

n sepa

rate_G

E_01U

S

Fig. 3.8.3-1 Power connections Dual Input Utility (option)



Fix the cables on accessory “A” with the enclosed cable ties.
Cable terminations are to the Rectifier/Bypass Input Lugs and Load Output Lugs as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for Input/Output and DC power connections on Bus Bars: see Section 3.8.1.

Dual Input Configuration Rectifier / Bypass (option)

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE Input Utility

Ground

N - Bypass

Bypass Neutral

For dual input configurations, a neutral conductor is required from the bypass source
only. The interconnection links BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 3.8.3-3).


Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE Load

Load Neutral

Load Ground