CAUTION !

Panels “A, B, C, D, E and F” should never be removed or replaced with power applied
to the UPS.
This panel is in close proximity to 480V live bus bars.
Always disconnect the rectifier, bypass, load and battery sources from the UPS
before removing or replacing this panel.
If not serious injury or death could occur!


How to access the compression lugs for the cable connections.

Top entry cables

Please remove the plate
before drilling any holes

!

SGSU_225

-300_S2_U

PS connec

tion_01US

F

!

B

A

Please remove the plate
before drilling any holes

Bottom entry cables

Q1

0 OFF

I ON

Q2

0 OFF

I ON

E

D

C

12

1

1

4

3

2

13

2

5

3 4

6 7 8

11

19 20 10

14 15 16

22

17 18

21

9

3

4

2

1

Fig. 3.8.1-1 Access to the input / output connections


To access input, output and Battery Connections proceed as follows:

• Unscrew bolts “B” to open the electronics “A”.
• Remove the protection panel “C”.
• Remove the protection panel “D”.
• Remove the protection panel “E”.
• Remove the UPS side panel “F”.

Modifications reserved

Page 22/40

OPM_SGS_ISG_M22_M30_2US_V010.doc

Installation Guide SG Series 225 & 300 UL S2

Advertising